Leyton Central is a contemporary new development comprising of one, two and three bed homes. Reflecting Leyton’s transformation into a vibrant and progressive hub every last detail of this sleek, modernist development has been considered.

KWB were invited to tender for the build and fit-out of the main Reception Area, having been successful in the tender process we commenced works in December 2015, works were completed in time for the launch in February 2016.

We worked in conjunction with Love Interiors to bring their stunning concept to life. The sculptural ‘origami’ balustrade to the mezzanine transformed what would otherwise be a functional structure in to a work of art.

The scope of works included:

Dry lining and partitioning
Plastering
Decorations
Floor Tilling
Feature panel wall
Bespoke letterboxes
Liquid applied metal finish reception desk
Secret doors and panelled wall
Sculptural balustrade
Recessed LED feature lights
Toilet to ground floor and mezzanine level
Kitchen to mezzanine level
Mechanical and Electrical installation

Facebook-icon Twitter-icon LinkedIn-icon

KWB Building Services Limited

38 Arthaus
205 Richmond Road
London
E8 3FF

© 2014 KWB Services Ltd.

020 8817 5230

Back to top